Friday, 16 May 2014

Production Document Risk Assessment



Risk Assessment
Group Members: Adam, Joeann, and Cast                  Location: Houses, bus stop, street

Hazard
Person(s) at Risk
Likelihood of Hazard
1 – Extremely Unlikely
5 – Extremely Likely
Severity of Hazard Outcomes
1 – Very Low Risk
5 – Very High Risk
Risk Level
(Likelihood + Severity)
2
Measures to Take to Manage Risk
Risk Managed?
Y/N
Being in the general public
Us and general public
4 – Likely, as not many people look where they are walking.
2 – If anyone tripped over equipment it wouldn’t be severe.
4 + 2 = 6 / 2 = 3
Medium Hazard
Watch equipment carefully, keep everything together.
Yes
Party scene
Cast
3 – when filming people may not be being careful of the equipment.
2 – If anyone trips over equipment it wouldn’t be severe.
3 + 2 = 5 / 2 = 2.5
Medium Hazard
Watch equipment carefully, keep everything together. Only keep camera out for short period.
Yes
Bus stop scene
Matthew Smith
3 – Running for bus, could fall over.
2 – If he trips no one will care, we’ll all laugh.
3 + 2 = 5 / 2 = 2.5
Medium Hazard
Make sure before there’s no bits of uneven pavement.
Run carefully
Yes
Bus stop scene
Matthew and Crew
2 – Standing by a busy road, caution of getting hit by cars.
4 – If someone got hit by a car injuries would be severe.
4 + 2 = 6 / 2 = 3
Medium Hazard
Be careful when crossing roads. Look before crossing.
Yes

No comments:

Post a Comment